







 |
 |
|
| NE-40-1000 |
 |
Installation Instructions
This Model For Recessed Mounting Only.
- Cut opening between studs 14 3/8" X 47" X 2 1/2" starting 30" above floor. Bottom opening level can be adjusted for desired board height.
- Attach 2" X 4" cleats to studs, level with bottom of opening.
- Insert cabinet into opening. Plumb cabinet and shim to fit. Sidewalls fit snugly against studs.
- Attach cabinet to studs with 1 1/2" X 1/4" lag screws through the 6 predrilled holes as shown. Predrill holes in the studs using 3/16" bit.
|
|
|
One-Year Limited Warranty...From date of purchase is replaced on all defective parts returned to factory for replacement, other than ironing board cover and pad, and finished or stained doors. This warranty does not include labor for installation of replacement. |
Mounting Height
Above Floor Level
|
|
|
|
Desired Board
Height
36"
35"
34"
33"
32"
31"
30"
29"
28"
|
Mount Cabinet
Above Floor
30"
29"
28"
27"
26"
25"
24"
23"
22"
|